Is it possible to finance EV charging infrastructure across multiple UK sites?
Summary: Yes — financing EV charging infrastructure across multiple UK sites is possible and increasingly common. Businesses typically combine asset finance, operating leases / Chargepoint-as-a-Service, green or sustainability loans, staged commercial lending and eligible government grants to spread cost and manage risk. Which route is best depends on who owns the sites, whether you prefer CAPEX (owning assets) or OPEX (service models), grid connection needs, and projected utilisation. UK Business Loans can match your project (from c.£10,000 upwards) with lenders and brokers who specialise in multi‑site rollouts. Get Quote Now — Free Eligibility Check
Important: UK Business Loans is an introducer — we do not lend or give regulated financial advice. Submitting an enquiry is not an application and will not by itself affect your credit score. Lenders or brokers you are introduced to may carry out credit and other checks if you proceed.
Why multi-site EV charging needs its own finance plan
Rolling out EV chargers across many locations creates technical, contractual and cashflow complexity that single-site installs do not. Sites can vary by electrical capacity, ownership (landlord vs tenant), expected dwell times, tariff structures and local planning or highway requirements. A tailored finance plan lets you align ownership, tax, and operating risk with business goals — whether you want to own the chargers, lease them, or buy a fully managed service.
Key considerations include: expected utilisation and revenue (if charging is paid), whether sites need grid reinforcement, landlord permissions, VAT and tax treatment, and whether you prefer to capitalise the project or use an OPEX model where a third party funds and operates the chargers.
Free Eligibility Check — Get Quote Now
Typical costs and factors that affect funding
Upfront installation costs
Commercial chargers (AC or DC rapid) vary widely by specification. Typical ballparks in the UK (hardware + standard installation) are:
- AC single-phase points: £1,000–£3,000 per point
- AC three-phase/fast points: £3,000–£6,000 per point
- DC rapid chargers: £20,000–£60,000+ per unit (site dependent)
These are indicative and depend on site complexity, number of points per location, and civil works.
Grid connection and site upgrade costs
Grid reinforcement or new connections can materially increase costs (from a few thousand to tens of thousands per site). Early liaison with the DNO (Distribution Network Operator) and an electrical design survey helps quantify this risk for funders.
Soft and ongoing costs
Soft costs include planning, permitting, site surveys, project management, signage and cabling trenches. Ongoing costs include maintenance, network fees, software management and electricity. Lenders will want to see realistic forecasts for all ongoing costs when assessing finance for multiple sites.
Funding options for multi-site EV charging
Below are the primary routes businesses use. A blended approach is common — part grant, part asset finance, part lease or service contract.
Asset finance / Hire purchase
Definition: Lender buys the equipment which your business repays over time; you usually take ownership at the end.
Pros: Preserves cash, spreads CAPEX, asset on balance sheet (depending on structure), lenders are comfortable with equipment as security.
Cons: Asset management responsibility, lender may require personal/company guarantees for some borrowers.
Best for: Companies wanting to own chargers and claim capital allowances.
Operating lease / Chargepoint-as-a-Service (CaaS)
Definition: Third party installs, owns and operates the chargers; you pay a service fee or share revenue.
Pros: Low/no upfront cost, transfers maintenance and uptime risk, predictable OPEX.
Cons: Higher long‑term cost than owning, less control over choice of hardware or pricing.
Best for: Businesses prioritising simplicity and rapid rollouts across many sites.
Commercial property loans / Refinance
Definition: Landlords or property-owning businesses can refinance or use property-secured finance to fund infrastructure.
Pros: Large sums available; long terms; can be suitable for landlord-led programmes.
Cons: Secured against property; higher transaction complexity.
Green business loans & sustainability loans
Definition: Lenders provide loans marketed for environmental projects; terms may be competitive and lenders may be experienced in energy infrastructure.
Pros: Lenders often factor in energy savings and carbon benefits in underwriting.
Cons: Criteria and availability vary; some require reporting on environmental outcomes.
For wider sustainability funding options see sustainability business loans.
Note: you can mix grant funding with commercial finance; grants typically reduce the upfront capital that needs funding.
Invoice finance / short-term bridging
Useful when you stage installation across sites and need working capital between invoicing milestones.
ESCO / Energy Services Contracts
ESCOs can fund, install and operate chargers in return for a share of revenue or a fixed fee, removing upfront risk for the site owner.
Get Quote Now — Free Eligibility Check
How lenders assess multi-site EV projects
Lenders and brokers will look at:
- Company financials and credit profile
- Project plan, number of sites and total project value (we typically handle projects from about £10,000 upwards)
- Installation quotes, site surveys and expected payback
- Evidence of permissions (landlord planning, highway authority), and DNO response for grid works
- Operational contracts (service agreements, PPAs or revenue forecasts)
To prepare: compile electrical surveys, recent electricity bills, installation quotes, landlord consents and a simple utilisation forecast.
Practical steps to secure finance across multiple sites
- Feasibility & site audit — identify sites ready for deployment and those needing major upgrades.
- Get multiple installer quotes and an independent energy survey.
- Check grant eligibility early (some grant schemes require pre-approval).
- Decide CAPEX vs OPEX — do you want to own the assets or outsource?
- Approach specialist lenders and brokers — accessible via an introducer to speed matching.
- Phase the rollout to manage cashflow and test commercial assumptions before full scale deployment.
Quick checklist you can copy:
- Number of sites & postcode list
- Estimated charger type per site (AC / rapid DC)
- Electricity bills (last 12 months) per site
- Installer quotes & DNO responses
- Landlord/ownership details
- Estimated project value (total and per site)
Free Eligibility Check — Start Your Enquiry
Typical timelines and staging for multi-site roll-outs
Expect variation by site complexity, but typical phases and indicative timings:
- Feasibility & site surveys: 2–6 weeks
- DNO application and grid works: weeks to many months depending on reinforcement
- Procurement & finance approval: asset finance or green loan approvals can be 1–4 weeks; commercial loans take longer
- Installation per site: 1–6 weeks
- Commissioning & software integration: days to weeks
Staged financing allows you to fund a pilot tranche, de‑risk, then scale using learnings and improved lender confidence.
Risks, pitfalls and how to avoid them
Common pitfalls:
- Underestimating grid reinforcement costs — mitigate by early DNO engagement.
- Ignoring landlord plans/consents — secure permissions before funding approval.
- No maintenance contract or weak warranties — ensure uptime SLAs and spare part agreements.
- Overly rigid contracts that prevent future hardware upgrades — negotiate flexibility.
- Failing to model realistic utilisation — use conservative revenue assumptions for funded cases.
Mitigations include independent technical due diligence, phased rollouts, and choosing financing that aligns with your ownership and exit strategy.
Case examples (anonymised)
Retail chain — 3 sites
Challenge: Retailer wanted chargers at 3 high-footfall stores but limited capital. Solution: Asset finance for AC chargers at each site with a 36-month term. Outcome: Low monthly cost and ownership after term; chargers generated additional customer dwell time and modest revenue offsetting repayments.
Logistics operator — 12 depots nationwide
Challenge: Large rollout with different electrical capacities and fleet charging needs. Solution: Mix of CaaS for smaller depots and funded rapid DC installs on core hubs using sustainability loans plus staged grant applications. Outcome: Faster rollout at lower upfront cost; centralised management via ESCO reduced operational burden.
Want a tailored quote? Get Quote Now — Free Eligibility Check
Frequently asked questions
Can grants cover multiple sites?
Some government grants and local incentives may be available per site (for workplace or commercial chargers), but availability and eligibility conditions vary. Grants often require early application and installation by approved suppliers.
Will I need landlord permission or planning?
Yes — landlord consent is usually required if you do not own the building. Some installations may need planning consent, particularly on public highways or conservation areas.
Are EV chargers classed as business assets for finance?
Yes — equipment finance providers typically treat chargers as business assets that can secure asset finance or hire purchase agreements, subject to lender criteria.
How does VAT and tax relief work?
Tax treatment depends on ownership and use. Businesses owning equipment may be able to claim usual capital allowances; leasing structures have different VAT and accounting treatment. Speak to your tax adviser for specifics.
Do lenders require performance data or PPAs?
Some lenders will want forecasts of usage and may ask for service contracts, PPAs or offtake agreements in revenue-backed models, especially for large rollouts.
Can I fund installations in phases?
Yes — phased financing is common: pilot tranche, review, then scale. This reduces risk and allows lenders to underwrite later stages with better data.
Start your Free Eligibility Check
How UK Business Loans helps
UK Business Loans is an introducer that connects businesses to lenders and brokers who specialise in business and sustainability finance. Complete a short enquiry and we’ll match your multi-site EV project (projects from approximately £10,000 upwards) with suitable funders or brokers who understand infrastructure and energy projects. The service is free and non‑obligatory — you decide whether to proceed.
Find out how our sustainability specialists work and what funding routes may suit your plans: how UK Business Loans works • sustainability business loans • finance FAQs.
Next steps & contact
Ready to explore funding for EV charging across multiple sites? Complete a short form and we’ll match you with lenders or brokers who can provide bespoke quotes. Get Quote Now — Free Eligibility Check
Privacy & data use: your details are only shared with finance partners relevant to your enquiry. We do not lend or provide regulated financial advice.
1. Can I get finance to install EV chargers across multiple UK sites? — Yes — businesses can finance multi‑site EV charging rollouts using asset finance, operating leases/CaaS, green/sustainability loans, commercial lending and grants, often from around £10,000 upwards.
2. What funding options are available for multi‑site EV charging projects? — Common options include asset finance/hire purchase, operating leases or Chargepoint‑as‑a‑Service (CaaS), green business loans, property‑backed loans, ESCO models, and staged grant + commercial finance blends.
3. How much does it typically cost to install commercial EV chargers per site in the UK? — Costs vary by charger type and site complexity, with AC single‑phase points about £1k–£3k, AC three‑phase £3k–£6k and DC rapid chargers from £20k–£60k+ plus possible grid works.
4. Will lenders fund projects that need DNO upgrades or grid reinforcement? — Yes, but lenders expect DNO responses or quantified grid upgrade costs before approving finance, so early engagement with the DNO is essential.
5. Can I combine government grants with commercial finance for EV charging across multiple sites? — Yes — grants can reduce upfront capital requirements and are often combined with asset finance or loans, though eligibility and timing vary so apply early.
6. Do I need landlord permission or planning consent to install EV chargers at multiple locations? — Usually yes — landlord consent is typically required where you don’t own the property and some public or conservation‑area installs may need planning or highway approvals.
7. Should I fund EV chargers as CAPEX (own assets) or use OPEX models like CaaS for multi‑site rollouts? — It depends on your priorities: CAPEX/ownership offers capital allowances and control, while OPEX/CaaS reduces upfront cost and transfers operational risk.
8. What documentation will lenders and brokers ask for when assessing multi‑site EV charging finance? — Expect to provide company financials, site list and postcodes, electrical surveys, recent electricity bills, installer quotes, DNO responses, landlord consents and a utilisation/revenue forecast.
9. Can I stage financing and rollout for multi‑site EV charger projects? — Yes — phased financing (pilot tranche, review then scale) is common to de‑risk projects and secure improved terms for later stages.
10. How quickly can UK Business Loans match my multi‑site EV charging project with lenders or brokers? — After a short free eligibility check you can often expect an initial match or response within hours, with broker/lender quotes following once detailed documentation is supplied.